Padma Bridge
a multipurpose road-rail bridge across the Padma River
Facts
20 propertiesIdentity
- Instance of
- truss bridge, road-rail bridge, multi-level bridge[5][6]
- Inception
- June 25, 2022[14]
- Official website
- www.padmabridge.gov.bd[16]
- Native label
- পদ্মা সেতু[21]
Location
- Country
- Bangladesh[4]
- Location
- Lohajang Upazila, Zajira Upazila[12][13]
- Coordinate location
- 🗺️ 23.444°, 90.261°
- Located in the administrative territorial entity
- Munshiganj District, Madaripur District, Shariatpur District[1][2][3]
Population and size
- Length
- 6,150 m[22]
More facts +10
- Capital cost
- 3,692,000,000 USD[24]
- Crosses
- Padma River[8]
- Date of official opening
- June 25, 2022[20]
- Main building contractor
- China Railway Major Bridge Engineering Group Co., Ltd.[11]
- Maintained by
- Bangladesh Bridge Authority[7]
- Next crossing upstream
- Lalon Shah Bridge[25]
- Number of spans
- 41[17]
- Width
- 18.18 m[23]
🏷️ Also known as
en Padma Multipurpose Bridge
en Padma Bridge
ar جسر بدما
de Padma-Brücke
fr pont de Padma
hi पद्मा सेतु
ja パドマ橋
nl Padmabrug
ru Падма (мост)
th สะพานปัทมา
uk Міст Падма
zh 博多大桥
zh 帕德玛大桥
zh-hant 博多大橋
🔖 Identifiers · 5
- Image (Wikimedia Commons)
- The padma bridge 02.jpg ↗
- BabelNet ID
- 02170536n
- Freebase ID
- /m/0cmcdtg
- OpenStreetMap way ID
- 821981466
- Topic's main category
- Category:Padma Bridge
🔗 Connections
Located in the administrative territorial entity 3
Location 2
Country 1
Crosses 1
Instance of 1
Maintained by 1
Next crossing upstream 1
Structural engineer 1
← Next crossing downstream 1
Press Enter · cited answer in seconds