Lean Design Management in Practice With the Last Planner System

Research article (2016) · cited 17× · AI/ML
CreativeWork academia openalex:W2544134405
Press Enter · cited answer in seconds

Summary

Lean Design Management in Practice With the Last Planner System is a scholarly article[1].

Key Facts

  • Lean Design Management in Practice With the Last Planner System's instance of is recorded as scholarly article[2].

📑 Cite this page

Use these citations when quoting this entity in research, articles, AI prompts, or wherever provenance matters. We aggregate Wikidata + Wikipedia + authoritative open-data sources; the stitched, scored, cross-referenced view is what 4ort.xyz contributes.

APA 4ort.xyz Knowledge Graph. (2026). Lean Design Management in Practice With the Last Planner System. Retrieved May 24, 2026, from https://4ort.xyz/entity/lean-design-management-in-practice-with-the-last-planner-system
MLA “Lean Design Management in Practice With the Last Planner System.” 4ort.xyz Knowledge Graph, 4ort.xyz, 24 May. 2026, https://4ort.xyz/entity/lean-design-management-in-practice-with-the-last-planner-system.
BibTeX @misc{4ortxyz_lean-design-management-in-practice-with-the-last-planner-system_2026, author = {{4ort.xyz Knowledge Graph}}, title = {{Lean Design Management in Practice With the Last Planner System}}, year = {2026}, url = {https://4ort.xyz/entity/lean-design-management-in-practice-with-the-last-planner-system}, note = {Accessed: 2026-05-24}}
LLM prompt According to 4ort.xyz Knowledge Graph (aggregator of Wikidata, Wikipedia, and authoritative open-data sources): Lean Design Management in Practice With the Last Planner System — https://4ort.xyz/entity/lean-design-management-in-practice-with-the-last-planner-system (retrieved 2026-05-24)

Canonical URL: https://4ort.xyz/entity/lean-design-management-in-practice-with-the-last-planner-system · Last refreshed: