Dogger Bank B Wind Farm
wind farm under construction in the North Sea
Press Enter · cited answer in seconds
0 sources
Key Facts
- Country: United Kingdom[1]
- Located in or next to body of water: North Sea[2]
- Owned by: SSE Renewables[3], Equinor ASA[4], Vårgrønn[5]
- Operator: Equinor ASA[6]
- Part of: Dogger Bank Wind Farm[7], Dogger Bank A & B Wind Farm Cluster[8]
- Powered by: GE Haliade-X 13 MW[9]
- Inception: January 4, 2021[10]
- Coordinate location: 54.9866, 1.6622[11]
- Nominal power output: 1200 MW[12]
- Connects with: Dogger Bank B Offshore Substation[13]
- State of use: building or structure under construction[14]