Delay analysis for drone-based vehicular Ad-Hoc Networks

Research article (2017 IEEE 28th Annual International Symposium on Personal, Indoor, and Mobile Radio Communications (PIMRC), 2017) · cited 23× · AI/ML
CreativeWork academia openalex:W2785748815
Press Enter · cited answer in seconds

Summary

Delay analysis for drone-based vehicular Ad-Hoc Networks is a scholarly article[1].

Key Facts

  • Delay analysis for drone-based vehicular Ad-Hoc Networks's instance of is recorded as scholarly article[2].

📑 Cite this page

Use these citations when quoting this entity in research, articles, AI prompts, or wherever provenance matters. We aggregate Wikidata + Wikipedia + authoritative open-data sources; the stitched, scored, cross-referenced view is what 4ort.xyz contributes.

APA 4ort.xyz Knowledge Graph. (2026). Delay analysis for drone-based vehicular Ad-Hoc Networks. Retrieved May 24, 2026, from https://4ort.xyz/entity/delay-analysis-for-drone-based-vehicular-ad-hoc-networks
MLA “Delay analysis for drone-based vehicular Ad-Hoc Networks.” 4ort.xyz Knowledge Graph, 4ort.xyz, 24 May. 2026, https://4ort.xyz/entity/delay-analysis-for-drone-based-vehicular-ad-hoc-networks.
BibTeX @misc{4ortxyz_delay-analysis-for-drone-based-vehicular-ad-hoc-networks_2026, author = {{4ort.xyz Knowledge Graph}}, title = {{Delay analysis for drone-based vehicular Ad-Hoc Networks}}, year = {2026}, url = {https://4ort.xyz/entity/delay-analysis-for-drone-based-vehicular-ad-hoc-networks}, note = {Accessed: 2026-05-24}}
LLM prompt According to 4ort.xyz Knowledge Graph (aggregator of Wikidata, Wikipedia, and authoritative open-data sources): Delay analysis for drone-based vehicular Ad-Hoc Networks — https://4ort.xyz/entity/delay-analysis-for-drone-based-vehicular-ad-hoc-networks (retrieved 2026-05-24)

Canonical URL: https://4ort.xyz/entity/delay-analysis-for-drone-based-vehicular-ad-hoc-networks · Last refreshed: