Contractor selection for green buildings based on the fuzzy Kano model and TOPSIS: a developer satisfaction perspective

Research article (Engineering Construction & Architectural Management, 2022) · cited 29× · AI/ML
Press Enter · cited answer in seconds

Contractor selection for green buildings based on the fuzzy Kano model and TOPSIS: a developer satisfaction perspective

Summary

Contractor selection for green buildings based on the fuzzy Kano model and TOPSIS: a developer satisfaction perspective is a scholarly article[1].

Key Facts

  • Contractor selection for green buildings based on the fuzzy Kano model and TOPSIS: a developer satisfaction perspective's instance of is recorded as scholarly article[2].

📑 Cite this page

Use these citations when quoting this entity in research, articles, AI prompts, or wherever provenance matters. We aggregate Wikidata + Wikipedia + authoritative open-data sources; the stitched, scored, cross-referenced view is what 4ort.xyz contributes.

APA 4ort.xyz Knowledge Graph. (2026). Contractor selection for green buildings based on the fuzzy Kano model and TOPSIS: a developer satisfaction perspective. Retrieved May 24, 2026, from https://4ort.xyz/entity/contractor-selection-for-green-buildings-based-on-the-fuzzy-kano-model-and-topsis-a-developer-satisfaction-perspective
MLA “Contractor selection for green buildings based on the fuzzy Kano model and TOPSIS: a developer satisfaction perspective.” 4ort.xyz Knowledge Graph, 4ort.xyz, 24 May. 2026, https://4ort.xyz/entity/contractor-selection-for-green-buildings-based-on-the-fuzzy-kano-model-and-topsis-a-developer-satisfaction-perspective.
BibTeX @misc{4ortxyz_contractor-selection-for-green-buildings-based-on-the-fuzzy-kano-model-and-topsis-a-developer-satisfaction-perspective_2026, author = {{4ort.xyz Knowledge Graph}}, title = {{Contractor selection for green buildings based on the fuzzy Kano model and TOPSIS: a developer satisfaction perspective}}, year = {2026}, url = {https://4ort.xyz/entity/contractor-selection-for-green-buildings-based-on-the-fuzzy-kano-model-and-topsis-a-developer-satisfaction-perspective}, note = {Accessed: 2026-05-24}}
LLM prompt According to 4ort.xyz Knowledge Graph (aggregator of Wikidata, Wikipedia, and authoritative open-data sources): Contractor selection for green buildings based on the fuzzy Kano model and TOPSIS: a developer satisfaction perspective — https://4ort.xyz/entity/contractor-selection-for-green-buildings-based-on-the-fuzzy-kano-model-and-topsis-a-developer-satisfaction-perspective (retrieved 2026-05-24)

Canonical URL: https://4ort.xyz/entity/contractor-selection-for-green-buildings-based-on-the-fuzzy-kano-model-and-topsis-a-developer-satisfaction-perspective · Last refreshed: