Collie BESS Stage 2
0 sources
Collie BESS Stage 2
Summary
Collie BESS Stage 2 is a power station[1].
Key Facts
- Collie BESS Stage 2 is located in Western Australia[2].
- Collie BESS Stage 2 is located in SWIS Region[3].
- Collie BESS Stage 2 is located in South Region[4].
- Collie BESS Stage 2 is located in Shire of Collie[5].
- Collie BESS Stage 2 is in the country of Australia[6].
- Collie BESS Stage 2's instance of is recorded as power station[7].
- Collie BESS Stage 2's instance of is recorded as battery storage power station[8].
- Collie BESS Stage 2 is owned by Neoen Australia[9].
- The location of Collie BESS Stage 2 was Shire of Collie[10].
- Collie BESS Stage 2 is part of South West Interconnected System[11].
- Collie BESS Stage 2 is used for ancillary services[12].
- Collie BESS Stage 2's source of energy is recorded as electricity[13].
- Collie BESS Stage 2's coordinate location is recorded as {'globe': 'http://www.wikidata.org/entity/Q2', 'altitude': None, 'latitude': -33.30845, 'longitude': 116.27983888888889, 'precision': 2.777777777777778e-06}[14].
- Collie BESS Stage 2's service entry is recorded as October 1, 2025[15].
- Collie BESS Stage 2's official name is recorded as COLLIE_BESS2[16].
- Collie BESS Stage 2's different from is recorded as Collie Battery Energy Storage System[17].
- Collie BESS Stage 2's different from is recorded as Collie Battery[18].
- Collie BESS Stage 2's nominal power output is recorded as {'unit': 'http://www.wikidata.org/entity/Q6982035', 'amount': '+300'}[19].
- Collie BESS Stage 2's energy storage capacity is recorded as {'unit': 'http://www.wikidata.org/entity/Q6009164', 'amount': '+1363'}[20].
- Collie BESS Stage 2's state of use is recorded as building or structure under construction[21].
Body
Geography
Collie BESS Stage 2 is in the country of Australia[6]. Located in include Western Australia[2], a state of Australia[22], in Australia[23], founded in 1901[24]; SWIS Region[3]; South Region[4]; and Shire of Collie[5], a shire of Western Australia[25], in Australia[26]. It is part of South West Interconnected System[11].
Designation and Status
Recorded instance of include power station[7] and battery storage power station[8].
History and Context
Collie BESS Stage 2 is owned by Neoen Australia[9].