Collie BESS Stage 2

A battery energy storage system located in the Shire of Collie, Western Australia
Place power_station Q133465099
Press Enter · cited answer in seconds

Collie BESS Stage 2

Summary

Collie BESS Stage 2 is a power station[1].

Key Facts

  • Collie BESS Stage 2 is located in Western Australia[2].
  • Collie BESS Stage 2 is located in SWIS Region[3].
  • Collie BESS Stage 2 is located in South Region[4].
  • Collie BESS Stage 2 is located in Shire of Collie[5].
  • Collie BESS Stage 2 is in the country of Australia[6].
  • Collie BESS Stage 2's instance of is recorded as power station[7].
  • Collie BESS Stage 2's instance of is recorded as battery storage power station[8].
  • Collie BESS Stage 2 is owned by Neoen Australia[9].
  • The location of Collie BESS Stage 2 was Shire of Collie[10].
  • Collie BESS Stage 2 is part of South West Interconnected System[11].
  • Collie BESS Stage 2 is used for ancillary services[12].
  • Collie BESS Stage 2's source of energy is recorded as electricity[13].
  • Collie BESS Stage 2's coordinate location is recorded as {'globe': 'http://www.wikidata.org/entity/Q2', 'altitude': None, 'latitude': -33.30845, 'longitude': 116.27983888888889, 'precision': 2.777777777777778e-06}[14].
  • Collie BESS Stage 2's service entry is recorded as October 1, 2025[15].
  • Collie BESS Stage 2's official name is recorded as COLLIE_BESS2[16].
  • Collie BESS Stage 2's different from is recorded as Collie Battery Energy Storage System[17].
  • Collie BESS Stage 2's different from is recorded as Collie Battery[18].
  • Collie BESS Stage 2's nominal power output is recorded as {'unit': 'http://www.wikidata.org/entity/Q6982035', 'amount': '+300'}[19].
  • Collie BESS Stage 2's energy storage capacity is recorded as {'unit': 'http://www.wikidata.org/entity/Q6009164', 'amount': '+1363'}[20].
  • Collie BESS Stage 2's state of use is recorded as building or structure under construction[21].

Body

Geography

Collie BESS Stage 2 is in the country of Australia[6]. Located in include Western Australia[2], a state of Australia[22], in Australia[23], founded in 1901[24]; SWIS Region[3]; South Region[4]; and Shire of Collie[5], a shire of Western Australia[25], in Australia[26]. It is part of South West Interconnected System[11].

Designation and Status

Recorded instance of include power station[7] and battery storage power station[8].

History and Context

Collie BESS Stage 2 is owned by Neoen Australia[9].

References

Programmatic citations — every numbered marker resolves to a verifiable graph row below.

Direct Wikidata claims

  1. [6] . wikidata.org.
  2. [7] . wikidata.org.
  3. [8] . wikidata.org.
  4. [9] . colliebattery.com.au. colliebattery.com.au. Provenance: wikidata.org.
  5. [2] . wikidata.org.
  6. [3] . wikidata.org.
  7. [4] . colliebattery.com.au. colliebattery.com.au. Provenance: wikidata.org.
  8. [5] . wikidata.org.
  9. [10] . colliebattery.com.au. colliebattery.com.au. Provenance: wikidata.org.
  10. [11] . wikidata.org.
  11. [12] . wikidata.org.
  12. [13] . wikidata.org.
  13. [14] . wikidata.org.
  14. [15] . australia.neoen.com. australia.neoen.com. Provenance: wikidata.org.
  15. [16] . aemo.com.au. aemo.com.au. Provenance: wikidata.org.
  16. [17] . wikidata.org.
  17. [18] . wikidata.org.
  18. [19] . data.wa.aemo.com.au. data.wa.aemo.com.au. Provenance: wikidata.org.
  19. [20] . colliebattery.com.au. colliebattery.com.au. Provenance: wikidata.org.
  20. [21] . australia.neoen.com. australia.neoen.com. Provenance: wikidata.org.

Inline context (facts about related entities)

  1. [22] . Wikidata. wikidata.org. → on this site
  2. [23] . Wikidata. wikidata.org. → on this site
  3. [24] . Wikidata. wikidata.org. → on this site
  4. [25] . Wikidata. wikidata.org. → on this site
  5. [26] . Wikidata. wikidata.org. → on this site

Class ancestry

  1. [1] . Wikidata. wikidata.org.

📑 Cite this page

Use these citations when quoting this entity in research, articles, AI prompts, or wherever provenance matters. We aggregate Wikidata + Wikipedia + authoritative open-data sources; the stitched, scored, cross-referenced view is what 4ort.xyz contributes.

APA 4ort.xyz Knowledge Graph. (2026). Collie BESS Stage 2. Retrieved May 3, 2026, from https://4ort.xyz/entity/collie-bess-stage-2
MLA “Collie BESS Stage 2.” 4ort.xyz Knowledge Graph, 4ort.xyz, 3 May. 2026, https://4ort.xyz/entity/collie-bess-stage-2.
BibTeX @misc{4ortxyz_collie-bess-stage-2_2026, author = {{4ort.xyz Knowledge Graph}}, title = {{Collie BESS Stage 2}}, year = {2026}, url = {https://4ort.xyz/entity/collie-bess-stage-2}, note = {Accessed: 2026-05-03}}
LLM prompt According to 4ort.xyz Knowledge Graph (aggregator of Wikidata, Wikipedia, and authoritative open-data sources): Collie BESS Stage 2 — https://4ort.xyz/entity/collie-bess-stage-2 (retrieved 2026-05-03)

Canonical URL: https://4ort.xyz/entity/collie-bess-stage-2 · Last refreshed:

Edit History

Rolling log of changes to this entity's Wikidata record. Values shown reflect the current state of each edited property — follow the history link to see the precise diff for any edit.

  1. 11w ago · ~2026-37801-57 · 2026-07-02 view diff on Wikidata ↗
    State of use building or structure under construction
    "/* wbsetclaim-update:2||1 */ [[Property:P5817]]: [[Q55654238]]"
  2. 19w ago · Cobleg · 2026-05-04 view diff on Wikidata ↗
    State of use building or structure under construction
    Instance of power station, battery storage power station
    Imported from
    Different from Collie Battery Energy Storage System, Collie Battery
    + 14 other properties edited (see Wikidata diff for full list)
    "/* wbsetclaim-create:2||1 */ [[Property:P2789]]: [[Q136793658]]"
Live feed via Wikidata EventStreams. New edits appear within minutes of being made on Wikidata.