Changping line
Railway line of Beijing Subway
Facts
21 propertiesIdentity
- Instance of
- rapid transit line
- Inception
- 2010[11]
Location
- Located in the administrative territorial entity
- Changping District, Haidian District[1][2]
More facts +15
- Date of official opening
- December 30, 2010[15]
- Route diagram template
- Template:Beijing Subway/Changping[23]
- Route number
- M27[16]
- SRGB color hex triplet
- D47DAA[7]
- Speed limit
- 100 km/h[22]
- State of use
- in use[24]
- Terminus
- Changping Xishankou station (2015–present), Xi'erqi station (2010–2021), Nanshao station (2010–2015), Qinghe Railway Station (2021–2023), Xitucheng Station (2023–present), Jimenqiao Station[8][9][10]
- Topic has template
- Template:北京地下鉄昌平線[14]
- Track gauge
- standard-gauge railway[13]
- Transport network
- Beijing Subway[4]
- Type of electrification
- 750 V DC railway electrification[12]
- Width
- 2,800 mm[19]
🏷️ Also known as
en Changping line
fr ligne Changping
hu Changping metróvonal
id Jalur Changping
it linea Changping
ja M27線
ja 北京地下鉄昌平線
ko 베이징 지하철 창핑선
sv Changpinglinjen
th รถไฟใต้ดินปักกิ่ง สายชางผิง
zh M27线
zh 北京地铁27号线
zh 北京地铁昌平线
zh 昌平线
zh-hans M27线
zh-hant M27線
zh-hant 北京地鐵昌平線
🔖 Identifiers · 4
- Image (Wikimedia Commons)
- CP043 entering Shahe (20250104170619).jpg ↗
- Freebase ID
- /m/05b3cf5
- OpenStreetMap relation ID
- 1350622
- Topic's main category
- Category:Changping Line, Beijing Subway
🔗 Connections
← Connecting line 16
Terminus 5
Located in the administrative territorial entity 2
Belongs to 1
Country 1
Track gauge 1
Transport network 1
Press Enter · cited answer in seconds