Investigating the challenges related to combining BIM and Last Planner System on construction sites

Research article (Frontiers of Engineering Management, 2020) · cited 17× · AI/ML
Press Enter · cited answer in seconds

Investigating the challenges related to combining BIM and Last Planner System on construction sites

Summary

Investigating the challenges related to combining BIM and Last Planner System on construction sites is a scholarly article[1].

Key Facts

  • Investigating the challenges related to combining BIM and Last Planner System on construction sites's instance of is recorded as scholarly article[2].

📑 Cite this page

Use these citations when quoting this entity in research, articles, AI prompts, or wherever provenance matters. We aggregate Wikidata + Wikipedia + authoritative open-data sources; the stitched, scored, cross-referenced view is what 4ort.xyz contributes.

APA 4ort.xyz Knowledge Graph. (2026). Investigating the challenges related to combining BIM and Last Planner System on construction sites. Retrieved May 24, 2026, from https://4ort.xyz/entity/investigating-the-challenges-related-to-combining-bim-and-last-planner-system-on-construction-sites
MLA “Investigating the challenges related to combining BIM and Last Planner System on construction sites.” 4ort.xyz Knowledge Graph, 4ort.xyz, 24 May. 2026, https://4ort.xyz/entity/investigating-the-challenges-related-to-combining-bim-and-last-planner-system-on-construction-sites.
BibTeX @misc{4ortxyz_investigating-the-challenges-related-to-combining-bim-and-last-planner-system-on-construction-sites_2026, author = {{4ort.xyz Knowledge Graph}}, title = {{Investigating the challenges related to combining BIM and Last Planner System on construction sites}}, year = {2026}, url = {https://4ort.xyz/entity/investigating-the-challenges-related-to-combining-bim-and-last-planner-system-on-construction-sites}, note = {Accessed: 2026-05-24}}
LLM prompt According to 4ort.xyz Knowledge Graph (aggregator of Wikidata, Wikipedia, and authoritative open-data sources): Investigating the challenges related to combining BIM and Last Planner System on construction sites — https://4ort.xyz/entity/investigating-the-challenges-related-to-combining-bim-and-last-planner-system-on-construction-sites (retrieved 2026-05-24)

Canonical URL: https://4ort.xyz/entity/investigating-the-challenges-related-to-combining-bim-and-last-planner-system-on-construction-sites · Last refreshed: