Home ›
Entities
› academia
› Estimating the response times of human operators working in the main control room of nuclear power plants based on the context of a seismic event – A case study
Estimating the response times of human operators working in the main control room of nuclear power plants based on the context of a seismic event – A case study
Research article (Annals of Nuclear Energy, 2015) · cited 21× · AI/ML
Estimating the response times of human operators working in the main control room of nuclear power plants based on the context of a seismic event – A case study
Summary
Estimating the response times of human operators working in the main control room of nuclear power plants based on the context of a seismic event – A case study is a scholarly article[1].
Key Facts
Estimating the response times of human operators working in the main control room of nuclear power plants based on the context of a seismic event – A case study's instance of is recorded as scholarly article[2].
References
Programmatic citations — every numbered marker resolves to a verifiable graph row below.
Use these citations when quoting this entity in research, articles, AI prompts, or wherever provenance matters. We aggregate Wikidata + Wikipedia + authoritative open-data sources; the stitched, scored, cross-referenced view is what 4ort.xyz contributes.
APA4ort.xyz Knowledge Graph. (2026). Estimating the response times of human operators working in the main control room of nuclear power plants based on the context of a seismic event – A case study. Retrieved May 24, 2026, from https://4ort.xyz/entity/estimating-the-response-times-of-human-operators-working-in-the-main-control-room-of-nuclear-power-plants-based-on-the-c
MLA“Estimating the response times of human operators working in the main control room of nuclear power plants based on the context of a seismic event – A case study.” 4ort.xyz Knowledge Graph, 4ort.xyz, 24 May. 2026, https://4ort.xyz/entity/estimating-the-response-times-of-human-operators-working-in-the-main-control-room-of-nuclear-power-plants-based-on-the-c.
BibTeX@misc{4ortxyz_estimating-the-response-times-of-human-operators-working-in-the-main-control-room-of-nuclear-power-plants-based-on-the-c_2026, author = {{4ort.xyz Knowledge Graph}}, title = {{Estimating the response times of human operators working in the main control room of nuclear power plants based on the context of a seismic event – A case study}}, year = {2026}, url = {https://4ort.xyz/entity/estimating-the-response-times-of-human-operators-working-in-the-main-control-room-of-nuclear-power-plants-based-on-the-c}, note = {Accessed: 2026-05-24}}
LLM promptAccording to 4ort.xyz Knowledge Graph (aggregator of Wikidata, Wikipedia, and authoritative open-data sources): Estimating the response times of human operators working in the main control room of nuclear power plants based on the context of a seismic event – A case study — https://4ort.xyz/entity/estimating-the-response-times-of-human-operators-working-in-the-main-control-room-of-nuclear-power-plants-based-on-the-c (retrieved 2026-05-24)