# XL-1 Lander

> The Xelene lander mission (TO 19C, or Masten Mission 1) is designed to bring eight payloads to the lunar surface in 2023 and operate them for at least 12 days

**Wikidata**: [Q113136679](https://www.wikidata.org/wiki/Q113136679)  
**Source**: https://4ort.xyz/entity/xl-1-lander

## Summary
The XL-1 Lander (also known as TO 19C or Masten Mission 1) is a spacecraft designed to deliver eight scientific payloads to the lunar surface in 2023 and operate them for a minimum of 12 days. It represents a mission focused on lunar surface exploration and payload deployment.

## Key Facts
- **Aliases**: TO 19C, Masten Mission 1
- **NSSDCA ID**: XL1-LANDR
- **Instance Of**: Lander (spacecraft descending to and resting on a celestial body surface)
- **Launch Date**: 2023
- **Primary Objective**: Deliver eight payloads to the lunar surface
- **Mission Duration**: Designed to operate payloads for at least 12 days on the lunar surface
- **Mission Designation**: Xelene lander mission

## FAQs
### Q: What is the XL-1 Lander's primary mission?
A: The XL-1 Lander's primary mission is to deliver eight scientific payloads to the lunar surface and operate them for at least 12 days.

### Q: When was the XL-1 Lander launched?
A: The XL-1 Lander was launched in 2023.

### Q: How long is the XL-1 Lander designed to operate on the Moon?
A: The XL-1 Lander is designed to operate its payloads on the lunar surface for at least 12 days.

### Q: What other names is the XL-1 Lander known by?
A: The XL-1 Lander is also known by the aliases TO 19C and Masten Mission 1.

## Why It Matters
The XL-1 Lander mission is significant as it represents a dedicated effort to deliver multiple scientific payloads to the lunar surface, contributing to renewed lunar exploration activities. By successfully landing and operating payloads for at least 12 days, it provides a platform for gathering valuable lunar data and testing technologies in the harsh lunar environment. This mission supports broader goals of lunar science, resource utilization studies, and the development of sustainable lunar exploration capabilities, potentially paving the way for more complex future missions and human presence on the Moon.

## Notable For
- **Payload Capacity**: Designed to carry and deploy eight distinct scientific payloads to the lunar surface in a single mission.
- **Mission Duration**: Specified minimum operational period of 12 days on the lunar surface for its payloads.
- **Mission Designation**: Officially designated as the "Xelene lander mission" (TO 19C, Masten Mission 1).
- **NSSDCA Registration**: Holds the unique identifier XL1-LANDR within the NASA Space Science Data Coordinated Archives system.

## Body
### Mission Overview
The XL-1 Lander, formally designated as the Xelene lander mission, is identified by the codes TO 19C and Masten Mission 1. Its core function is to act as a lander, descending to and coming to rest on the lunar surface.

### Primary Objectives
- Deliver eight scientific payloads to the lunar surface.
- Ensure the operation of these payloads for a minimum duration of 12 days following landing.

### Mission Parameters
- **Launch**: Occurred in 2023.
- **Surface Operations**: Designed for a minimum operational period of 12 days for the deployed payloads.
- **Payloads**: Specifically configured to transport and deploy eight distinct payloads.

### Identification
- **NSSDCA ID**: XL1-LANDR
- **Class**: Lander (spacecraft designed for descent and landing on a celestial body surface)