# Productivity based method for forecasting cost & time of earthmoving operations using sampling GPS data

> Research article (Journal of Information Technology in Construction, 2016) · cited 39× · AI/ML

**Wikidata**: [openalex:W2302853740](https://www.wikidata.org/wiki/openalex:W2302853740)  
**Source**: https://4ort.xyz/entity/productivity-based-method-for-forecasting-cost-time-of-earthmoving-operations-using-sampling-gps-data
