# Predicting the construction projects time and cost overruns using K-nearest neighbor and artificial neural network: a case study from Jordan

> Research article (Asian Journal of Civil Engineering, 2023) · cited 36× · AI/ML

**Wikidata**: [openalex:W4365455841](https://www.wikidata.org/wiki/openalex:W4365455841)  
**Source**: https://4ort.xyz/entity/predicting-the-construction-projects-time-and-cost-overruns-using-k-nearest-neighbor-and-artificial-neural-network-a-cas
