# Moving toward lean construction through automation of planning and control in last planner system: A systematic literature review

> Research article (Developments in the Built Environment, 2024) · cited 15× · AI/ML

**Wikidata**: [openalex:W4393247176](https://www.wikidata.org/wiki/openalex:W4393247176)  
**Source**: https://4ort.xyz/entity/moving-toward-lean-construction-through-automation-of-planning-and-control-in-last-planner-system-a-systematic-literatur
