# Implementing BIM and Lean Construction Methods for the Improved Performance of a Construction Project at the Disassembly and Reuse Stage: A Case Study in Dezhou, China

> Research article (Sustainability, 2024) · cited 23× · AI/ML

**Wikidata**: [openalex:W4390738926](https://www.wikidata.org/wiki/openalex:W4390738926)  
**Source**: https://4ort.xyz/entity/implementing-bim-and-lean-construction-methods-for-the-improved-performance-of-a-construction-project-at-the-disassembly
