# Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation

> Research article (Transportation Research Part A Policy and Practice, 2016) · cited 128× · AI/ML

**Wikidata**: [openalex:W2517278742](https://www.wikidata.org/wiki/openalex:W2517278742)  
**Source**: https://4ort.xyz/entity/cost-overruns-in-transportation-infrastructure-projects-sowing-the-seeds-for-a-probabilistic-theory-of-causation
