# A control approach investigation of the Xe-100 plant to perform load following within the operational range of 100 – 25 – 100%

> Research article (Nuclear Engineering and Design, 2017) · cited 23× · AI/ML

**Wikidata**: [openalex:W2773227107](https://www.wikidata.org/wiki/openalex:W2773227107)  
**Source**: https://4ort.xyz/entity/a-control-approach-investigation-of-the-xe-100-plant-to-perform-load-following-within-the-operational-range-of-100-25-10
